About the Project
Morel Energy Storage (“Morel”) is ideally located in Moffat County, Colorado on approximately 32 acres, where it interconnects to critical transmission infrastructure at Tri-State Generation and Transmission’s (“Tri-State”) Craig Substation. This facility will provide much-needed energy storage capacity and services to the Tri-State electrical grid on the Western Slope, enhancing grid reliability and accelerating the integration of locally produced energy resources.
About Plus Power
Plus Power develops, owns, and operates utility-scale energy storage facilities that enable a more efficient and reliable electrical grid to support residents and businesses. The Plus Power team, led by seasoned executives from the energy industry, is accelerating the deployment of transmission-connected battery storage throughout the United States.